October 2012
This month Peter continued with the ceiling and finished it at the front.
Peter has fitted two LED lights for map reading lights. |
The front ceiling is almost complete. All of the map reading lights are in. The four pairs are switched individually. |
The final front strip is placed and the lights are on. |
Peter added another sheet of the side. |
This completes the front section of the ceiling. Soon Peter will fit a rear view camera. Then he can fit the house lights and finish the front ceiling. |
November 2012
Peter worked on the house lights.
Wood is all around. | And the aluminium strip for the LEDs, too. |
December 2012
This month Peter...
Fitted the LED strip lights |
Lights on without cover |
Showing cover lights off |
Lights on with cover (test fit) |
Installed a rear vision camera. |