April 2013

This month Peter worked on the ceiling.

April 2013 mammothmotorhome.com Peter has made the 'rails' for the ceiling and lights. April 2013 mammothmotorhome.com
The first rear ceiling panel is up.

April 2013 mammothmotorhome.com And the second (and last full sheet). It is complete with a cut-out for the roof hatch. April 2013 mammothmotorhome.com
The aluminium strip and lights are in place.

April 2013 mammothmotorhome.com The 5 meter light 'rope' was divided in half for 2.5 meters each side. April 2013 mammothmotorhome.com
The lights are on. These take ~24 watts.

April 2013 mammothmotorhome.com The rear lights are warm white, but the front lights are 'day light' white. April 2013 mammothmotorhome.com Viewed from both sides just to show you the contrast.
April 2013 mammothmotorhome.com The rear (middle?) roof hatch surround is finished. April 2013 mammothmotorhome.com
Here is a close-up look.

May 2013

This month Peter worked on the rear corner to cover the last remaining part of the walls.

May 2013 mammothmotorhome.com This is the last remaining part of the walls that needs to be sheeted. May 2013 mammothmotorhome.com
Last wall.

May 2013 mammothmotorhome.com
That looks better.

May 2013 mammothmotorhome.com All the pieces are cut. Unfortunately, Peter is waiting of the corner joining strip.
May 2013 mammothmotorhome.com
More ceiling panels placed
May 2013 mammothmotorhome.com Still waiting for the corner joining strip.

June 2013

No photos this month.


Go to July - September 2013