22nd month (April 2006)

Well, we are in the last three months before our 2 year anniversary of this project!

months 22 Finishing the old W.C. area. months 22 Finished under the old W.C.
months 22 Bending and fitting the ceiling panels. We need to finish the rear frame before we can glue the panels. months 22


Finished the roof repair
months 22 The polystyrene arrived. months 22 We started using 600ml Sikaflex sausages
months 22 The queen bed mock-up months 22
and the kid's bunk beds
months 22
We tried several stairs
months 22  This did not work out.
months 22
Before...
months 22
After... Now all the bin area is repaired.

23rd month (May 2006)

In this month we should be working on the front frame!

That was the plan... But we are still waiting for the roller to bend our hollow section (frame)

months 23
We fitted the front door
months 23
and welded the hinges in-place
months 23
The door and hinges are from the front
months 23
Door closed.
months 23 We made the frame for the stairs months 23 and Sikaflexed the panel/wall
months 23
The stair steps are made
months 23
Top view
months 23
With the stairs done, we concentrate on the floor. Starting at the rear.
months 23
We made a hat section (pan). It is 40mm deep which will be filled with polystyrene.
months 23


The area is completely sealed (Sikaflex).
months 23 And the insulation cut to size and fitted. The insulation around the engine is the ceramic blanket that also went into the engine box.

24th month (June 2006)

At the end of this month will be our 2 year anniversary.

This month we glued the floor boards down, completed the rear frame, and started on the front frame.

months 24 We laid the insulation months 24 and then glued the floor boards.
months 24
The roller
months 24 and the rolled
months 24
We finished the rear frame!  :-)
months 24 Looking from the front.
months 24
We turned the motorhome around
months 24
and started working on the front frame

Go to Months 25-27 (July - September 2006)